Last updated:
Most orders at Dough Tee are made for one baker. A name goes onto an apron, a starter’s name goes onto a jar on a tee, a bakery name goes across a mug. That is why the first day after you order matters so much. This page explains the 24-hour window to cancel or change an order, what can be changed inside it, how to ask, and what happens to your money when an order is cancelled. If the window has already closed, the last sections show the route that is still open to you.
Cancelling or changing, at a glance
- Window: you can cancel or change an order within 24 hours of placing it.
- How to ask: email support@doughtee.shop with your order number and exactly what should change.
- Typos in a name: we print exactly what was typed, so a spelling fix also has to reach us within 24 hours.
- Nothing to sign off: nothing is emailed for approval before your order is made.
- Refund for a cancelled order: issued to the original payment method you paid with.
- Refund for a returned piece: within 7 days of receiving the return.
- After the window: every piece can still be returned within 60 days from delivery, and we send a free return label.
1. Why the window is 24 hours
Every piece in the shop is made to order by our print partner once the order is placed. Nothing sits ready on a shelf with your name on it. Making the order takes 1–3 business days, and the first part of that time is when your apron, tee, towel or mug moves from an order into a piece of fabric or ceramic with ink on it.
So the 24 hours is not a formality. It is the stretch of time in which a change is still a change to an order, and not a request to undo something already made. Think of it like the feed the night before a bake day: there is a moment when you can still adjust the ratio, and a moment when the starter is simply doing its work. The sooner you write, the easier everything is.
The clock starts when you place the order, the time shown on your order confirmation email. It does not start when you open the email, and it does not pause over a weekend.
2. What you can change inside the 24 hours
Within the window, write to us and we will help with any of these:
- The name or second line. A misspelled bakery name, a starter called Gertie typed as Gerty, a “fed since” year that should be one year earlier, a capital letter you meant to keep.
- The size. Moving a tee, crewneck sweatshirt or the hoodie from one size to another between S and 5XL. If you are unsure which size to move to, read the Size Guide before you write.
- The colour. A garment colour, the printed colour of the Home Bakery Name Apron or the Scored Loaf Apron, the strap colour on the Dozen on the Sheet Strap Apron, Black or White on the Bench Name Embroidered Apron, the tote colour, or the inside colour of the Between Folds Mug.
- The mug size. Switching between 11 oz and 15 oz where a mug offers both.
- The shipping address. A missing apartment number, the wrong postcode, or sending a gift straight to the baker instead of to you.
- Items in the order. Taking a piece out, or cancelling the whole order.
If a change alters the order total, for example moving a tee from L to 3XL, which carries an upsize add-on, we write back with the new total before anything is changed and wait for your yes.
3. How to ask, step by step
- Find your order number. It is at the top of the order confirmation email, and in your account under My Account if you checked out with one.
- Write to support@doughtee.shop, ideally from the email address you used at checkout. Put “Cancel” or “Change” in the subject line.
- Say exactly what should change. For a name, type the full corrected name the way it should print, with the capitals and punctuation you want. “Please change Sourdogh to Sourdough” is better than “please fix the spelling”.
- Send it. Writing to us within the 24 hours is what counts, so the time your email reaches us is the time we go by.
- Wait for our reply. We answer within 24 hours on business days, and the change or cancellation is settled once we have confirmed it to you by email.
Please send one message per order and put everything in it. Two short emails ten minutes apart can cross each other, and the second one may undo the first. If you remember something else, reply on the same thread.
If you would rather use a ready-made message, the Submit a Ticket page has a link for each kind of request with the subject already written.
4. Names, spelling and the “print exactly as typed” box
Before a personalised piece goes into the cart, the product page shows the name as it will print, and asks you to tick “I have checked the spelling. Print exactly as typed.” That box is there because we really do print exactly what is typed: every letter, every capital, every full stop and ampersand. We do not correct spelling, add capitals or tidy spacing, because a name that looks like a typo to us may be the way your bakery has always written it.
Nothing is emailed to you for approval, either. Nothing is sent to you for sign-off before production. The lettering on the product page is the last look you get before the piece is made, and the 24-hour window is the only time a typo can still be fixed.
A worked example: Sourdogh
A baker orders a Home Bakery Name Tee for her Saturday porch pickup and types “Sourdogh Saturdays”. One hour later, reading the confirmation email over a cup of coffee, she sees the missing “u”. She replies to the confirmation thread, writes to support with “Change” in the subject and the line “Please print: Sourdough Saturdays”, and we confirm the change. That is the window doing exactly what it is for.
Had she noticed it three days later, the tee would already have been made. It could still come back within 60 days from delivery with a free label, but it would be a return, and the corrected tee would be a new order.
Character limits when you change a name
A corrected name still has to fit the product’s limit: up to 26 characters for the bakery name on the Home Bakery Name Apron, with up to 28 on its optional second line, up to 14 for a starter name on the Starter Jar Name Tee, and up to 16 on the Bench Name Embroidered Apron. If your new name runs longer, for example “Maple Street Micro Bakery” on the Bench Name Embroidered Apron, it will not fit there. Tell us in the same email and we will help you move the order to a piece that takes the longer name, such as the Home Bakery Name Apron.
5. Changes to the shipping address
Address mistakes are the ones that cost the most time later, so they are worth checking the moment the confirmation arrives. Inside the 24 hours, send us the full corrected address, not just the part that changed, so nothing is copied across wrongly.
Dough Tee ships free from the USA to the United States, Canada, Australia and New Zealand only. A new address has to be in one of those four countries. If you are sending a gift to a baker in Toronto or Auckland, the order still takes 1–3 business days to make and then 7–14 business days in transit, and any import duties or taxes depend on the destination country. The Shipping & Delivery page explains the rest.
Once a parcel has shipped, tracking details are emailed to you, and we cannot redirect it from our side. If you notice an address problem after that point, contact us and we will help you work out the next step.
6. Cancelling an order and how the refund works
To cancel, email us within 24 hours of placing the order with “Cancel” and your order number in the subject. Tell us whether you want the whole order cancelled or only some of the pieces in it.
When we confirm the cancellation, the refund for the cancelled pieces is issued to the original payment method you paid with. We do not move it to a different card or account. Your bank or payment provider then decides how it shows on your statement, and if you are unsure whether it has arrived, contact us and we will help you trace it.
Because shipping is free to all four countries we ship to, there is no separate shipping charge to work out on a cancelled order. If only part of an order is cancelled, the rest is made and shipped as normal.
| Situation | What you do | Where the money goes |
|---|---|---|
| Whole order cancelled within 24 hours | Email us with “Cancel” and the order number | Refund issued to the original payment method |
| One piece removed within 24 hours | Email us naming the piece to remove | Refund for that piece issued to the original payment method |
| Size or colour change that raises the total | Reply yes to the new total we send | We explain how the difference is paid before changing anything |
| Window closed, piece delivered | Start a return within 60 days from delivery | Refund within 7 days of receiving the return |
For everything about refund amounts, store credit and timing, read the Refund Policy.
7. When the 24 hours have passed
After the window, the order is with our print partner and the piece is being made or has been made. We cannot promise a cancellation or change at that point. It is still worth writing if something is wrong, though, and we will tell you plainly what can and cannot be done for your order.
What stays open to you is the return. Every piece, personalised or not, can be returned within 60 days from delivery. That includes a mug with a bakery name, a towel with “Tuesday Loaf” across it, and a hoodie in the wrong size. For a change-of-mind return we send a free return label, so it costs you nothing to send back. Once the return reaches us, the refund is issued within 7 days. The full process is on the Returns & Exchanges Policy page.
If you simply need a different size or name
The quickest route after the window is often to place a new order for the piece you want and return the first one for a refund when it arrives. That way the new piece starts its 1–3 business days of making straight away, instead of waiting for the first one to travel back.
8. Gifts, deadlines and changing your mind about timing
Many orders here are gifts: a partner buying an apron for the baker who sells sourdough on Saturdays, or a grown child buying a cookie-swap set of four crewnecks for a parent and three friends. Gift orders follow the same window. If you realise inside 24 hours that the recipient’s size is wrong, or that the gift should go straight to them, write to us and we will help.
We cannot guarantee a delivery date, for a birthday or for the holidays. If you are ordering two weeks before a birthday, add up the time honestly: 1–3 business days to make, then 7–14 business days in transit. Business days leave out weekends, so two calendar weeks can be shorter than the total. If the timing no longer works for you and you are still inside the 24 hours, you can cancel. If you are past it, the piece can still come back within 60 days from delivery.
Several pieces in one cart
If you bought four crewnecks for a cookie swap and one person’s size turns out to be wrong, you only need to change that one. Name the piece clearly in your email, for example “the second Cookie Swap Crewneck Sweatshirt, size M, please change to L”, so we change the right line of the order.
9. Things we cannot do
- We cannot hold an order back while you decide. If you are unsure, it is better to cancel inside the 24 hours and order again when you are ready.
- We cannot email you anything to sign off, or a picture of the finished piece, before it is made.
- We cannot change a name to one longer than the product allows; we will help you choose a piece that fits it instead.
- We cannot ship to countries outside the United States, Canada, Australia and New Zealand.
- We take changes by email only, because support is by email only, which also gives both of us a written record of exactly what was asked.
10. Contact us
Write to support@doughtee.shop with your order number and exactly what you need. We reply within 24 hours on business days. Our address is Dough Tee, 2137 Roselawn Dr, Fremont, OH 43420, US; please do not send parcels there without contacting us first, because returns go to the address on the label we send you.
Related pages: Order Tracking for where your parcel is, FAQs for quick answers, and the Help Center for everything else.